0007. Missions are run by a supervisor program and a coordinator agent

  • Status: Accepted (amended by 0032: the coordinator presents its report and merges only after the person approved; it no longer closes on its own word, and closing tidies the mission; and by 0033: a lead starts missions, whose coordinator answers to it)
  • Date: 2026-11-06

Context

In the prototype, a mission was led by an LLM agent that waited on its workers in a loop, with broad permissions. If it died or ran out of context, the mission stayed “active” forever. “Done” meant “finished a turn”, not “delivered”.

Decision

A mission has a goal, one or more repositories, a kind (change delivers branches and pull requests; analysis delivers reports) and two halves:

  • The supervisor, a program inside the daemon. It launches the coordinator, tracks workers, waits for them without tokens, verifies delivery evidence (ADR 0011) when a worker stops, retries or escalates, and closes the mission only when every worker has delivered or been abandoned by the human.
  • The coordinator agent, an LLM session with the MCP tools spawn_worker, send_message, report and close_mission. It splits the goal, writes worker tasks, answers their questions or escalates them to the human, and writes the final report. It is woken by messages from the supervisor and its workers; it never polls.

A mission can be aborted at any time; aborting never deletes work.

Consequences

  • Waiting costs nothing; the LLM is used for judgement only.
  • Delivery is checked by code, so “done” means pushed, reviewed or reported.
  • The coordinator needs no multiplexer or administrator rights.

Alternatives considered

  • LLM-only coordinator (the prototype). Fragile, expensive while waiting, and unverifiable.
  • Program-only coordinator. Cannot split a fuzzy goal or answer a worker’s design question.